Skip to main content
The Markets by Proactive
Go to Proactive Australia

Archive

Kootenay Silver announces positive drill results from Phase 4 program at Columba Project in Mexico

Kootenay Silver announces positive drill results from Phase 4 program at Columba Project in Mexico

Kootenay Silver CEO Jim McDonald joined Steve Darling from Proactive to share the latest assay results from drilling at the Columba Silver project in Mexico. McDonald telling Proactive these first 6 holes of the Phase 4 program have extended the known mineralization at both the D Vein and F Vein targets. The highest grade intercept saw 795 gpt silver, 0.95% lead and 1.47% zinc over one meter. The total Phase 4 program will consist of 15,000 metres of drilling.