Skip to main content
The Markets by Proactive
Go to Proactive Australia

Archive

Altiplano Metals latest drill results at Farellon Mine confirms continuity of Vein System at depth

Altiplano Metals latest drill results at Farellon Mine confirms continuity of Vein System at depth

McIntyre telling Proactive the company drilled 8 underground drill holes from drill pad 1 totalling 1,857 metres. Results confirm continuity of the Farellon Vein System at depth.

McIntyre says drilling also confirmed the strike extent of the vein system is over 230 metres with a width of 2.5 m to 5 metres and averaging 3.68 metres.