Altus Strategies (LON:ALS) – IPO – First day of dealing – First project generation company lists on AIM
BlueJay Mining* (LON:JAY) STRONG BUY - Target Price raised to 24p from 22p – Ilmenite depth exceeds drill capacity
BlueRock Diamonds* (LON:BRD) – £860,000 fund raising
Endeavour Mining (CVE:EDV) – Sale of Nzema mine – a possible yardstick for west African gold mine value
Georgian Mining* (LON:GEO) STRONG BUY – Strengthening the team
Kefi Minerals* (LON:KEFI) – Residual funding requirement reduced
Rainbow Rare Earths Ltd (LON:RBW) – Higher grades identified for first 2 years of production
Savannah Resources (LON:SAV) – Drilling report from Mina do Barroso
North Korea – promises Guam strike plan in days (BBC)
• The North Korean leadership has promised to fire four missiles near the US island of Guam in a move which may provoke the US into military action.
• Curiously, the could suit Chinese plans for military dominance in the South China seas and the North Pacific.
• This suggests to us that the Chinese military may be pulling more strings in Pyongyang than we had previously considered, hence their refusal to cut oil the supply to North Korea.
• So is Kim Jong-un acting for the Chinese military using North Korea to push the US and others out of the South China Seas and the Pacific?
• How has North Korea acquired so much military technology and the ability to build nuclear warheads and intercontinental ballistic missiles?
• The world has not faced this form of brinkmanship since the end of the Cold War. But is it brinkmanship or simply the beginning of the end for North Korea?
Dow Jones Industrials -0.17% at 22,049
Nikkei 225 -0.05% at 19,730
HK Hang Seng -1.13% at 27,444
Shanghai Composite -0.42% at 3,262
FTSE 350 Mining -1.15% at 16,725
AIM Basic Resources +1.11% at 2,473
Economic News
Currencies
US$1.1716/eur vs 1.1724/eur yesterday. Yen 109.90/$ vs 109.72/$. SAr 13.361/$ vs 13.466/$. $1.298/gbp vs $1.300/gbp.
0.788/aud vs 0.787/aud. CNY 6.660/$ vs 6.679/$.
Commodity News
Precious metals:
Gold US$1,279/oz vs US$1,268/oz yesterday
Gold ETFs 66.2moz vs US$66.2moz yesterday
Platinum US$976/oz vs US$976/oz yesterday
Palladium US$897/oz vs US$894/oz yesterday
Silver US$17.07/oz vs US$16.64/oz yesterday
Base metals:
Copper US$ 6,448/t vs US$6,496/t yesterday
Aluminium US$ 2,031/t vs US$2,033/t yesterday
Nickel US$ 10,815/t vs US$10,765/t yesterday
Zinc US$ 2,937/t vs US$2,962/t yesterday
Lead US$ 2,371/t vs US$2,403/t yesterday
Tin US$ 20,250/t vs US$20,320/t yesterday
Energy:
Oil US$52.9/bbl vs US$52.1/bbl yesterday
Natural Gas US$2.891/mmbtu vs US$2.825/mmbtu yesterday
Uranium US$20.65/lb vs US$20.65/lb yesterday
Bulk:
Iron ore 62% Fe spot (cfr Tianjin) US$75.4/t vs US$73.7/t
Chinese steel rebar 25mm US$648.8/t vs US$641.1/t
Thermal coal (1st year forward cif ARA) US$76.0/t vs US$74.7/t yesterday
Premium hard coking coal Aus fob US$193.6/t vs US$193.6/t
Other:
Tungsten APT European US$240-248/mtu vs US$230-235/mtu
Company News
Altus Strategies (LON:ALS) 10.75p, Mkt Cap £11.6m – First project generation company lists on AIM today
• Altus Strategies, an exploration stage company engaged in the discovery, acquisition and exploration of Africa-based mineral properties prospective in a broad range of commodities including precious and base metals, bauxite and iron ore, starts trading on AIM today.
• The ‘Project Generator’ model is better known in Canada and Australia where there are multiple companies working in this way and were project generation has led to the discovery and delineation of resources with significant value.
• Management: are well known, well respected, well backed by a number of connected expert advisors. See company website for further details.
• https://www.altus-strategies.com/corporate/who-we-are/
o The core Altus team go back a long way with Steven Poulton (CEO), Matthew Grainger (Executive Director) and David Netherway (Chairman) having been involved in a number of Africa-based projects building strong track records in discovering, developing and monetising grassroots mineral projects.
o JV “earn in” agreements carry shareholders through the exploration/discovery stage, one of the riskiest as well as most rewarding parts in the average mining project life cycle, while retaining upside from a potential discovery and minimising dilution to existing shareholders.
o Altus currently have two JV partnerships in place earning an interest in copper properties in Ethiopia where JOGMEC has just finished a third programme of drilling and bauxite licenses in central Cameroon where JV partner Canyon Resources is studying potential for a DSO operation supplying high grade and low impurity concentrate to local/overseas smelters; a number of drill ready targets over gold and base metals tenements in Cameroon and Morocco; an early stage gold prospect in Liberia; iron ore exposure in infrastructure poor but rich in high grade projects West Africa; and a team of 16 geologists/mining specialists, combined experience of which covers most of the continent (see front page map) who sort through available prospects and manage the projects pipeline.
o We view Altus as an opportunity to get involved in a portfolio of promising early stage projects with downside minimised by the project generator business model and backed by a team with a proven track record in the mining industry. A lack of new discoveries and heightened concerns over reserves replacement among mining companies should see a positive revision to exploration budgets and increased interest in JV type funding deals.
o Exploration budgets are at multi year lows following a near 70% drop in exploration spend from a 2012 peak of $33bn to c.$10bn in 2016, the weakest reading since the second half of the last decade. While Africa, the sole operating jurisdiction of Altus Strategies, remains significantly underexplored with the latest exploration spend data from MinEx Consulting showing that the continent accounted for only 14% of the global exploration budget in the last decade while yielding 22% of all discoveries and the highest number of top tier discoveries in the respective period.
• Business model: generation of through the staking of claims in new potential mining areas; to joint venture assets as they develop at a relatively early stage; to use joint ventures to earn fees and pay for work programs. Joint venture partners are junior, mid cap and larger mining companies.
• The theory: is that the joint venture partners should pay for much of the cost of the new work programs while supporting a proportion of the cost borne by Altus staff in the field.
• For example: SolGold (mkt cap ~£572m) shares its giant Cascabel project with Cornerstone which has a free carry on the project and is successful through SolGold’s expenditure, determined management efforts and financial support from Newcrest. Cornerstone hold 15% of the project with an implied value of around £100m today.
• Peer: Altus’ closest peer on AIM is Stratex which has had a tough time with investors but has reaped value from the sale of its Turkish mineral discoveries and developments which it now intends to ploughing into two gold projects in Brazil.
• Assets: Altus do have a number of existing mineral assets within the portfolio giving the company significant potential for upside generation.
• Potential: Altus’ geological team have the respect, connections and relationships with local geologists and their offices to quickly stake promising claims. This should put Altus in poll position to grab good looking mineral licenses as they come available.
Conclusion: Altus Strategies fills a gap in the process of project generation left by the exit of the Majors from grass-roots and sometimes brownfields exploration. Altus offers a broad portfolio of existing exploration assets alongside the potential to acquire new assets for value creation. We expect to see regular news flow on new project development and on interest from joint venture partners.
BlueJay Mining* (LON:JAY) 15.5p, Mkt Cap £119m – Ilmenite depth exceeds drill capacity
STRONG BUY
Target Price raised to 24p from 22p
(See pdf note attached for site visit photos)
• BlueJay Mining report significant progress at the Pituffik ilmenite (titanium mineral sand) project in Greenland this field season.
• Sonic drill rig: The newly acquired Sonic-drill rig as recommended by SRK Consultants is working well and shows mineral sands to a depth of over 30m in some areas exceeding the length of available drill rods and casing. The Sonic rig is reported to be working well and to be drilling off five to six holes per day depending on depth. We witnessed the first test drill hole on the recent site visit to Moriusaq Bay, Greenland.
• Resource: This dramatically exceeds our depth expectations and definitely exceeds the 1m depth assumed in the SRK JORC resource based on auger drilling.
• It is too early to give an accurate estimate as to the eventual scale of the mineral sands at Pituffik eg at Moriusaq Bay and Interlak Delta area but it is easy to make the assumption that the resource should expand to a significant multiple of the current and relatively conservative SRK estimate of 23.6mt grading 8.8% ilmenite.
• Early indications suggest to us that the ilmenite rich sands at surface may be equally well distributed at depth with no or very few apparent layers of rocks, aggregates or other minerals seen in preliminary drilling. This may or may not extend over much of the deposit but given that the ilmenite rich material is so much heavier than any other mineral it may be that most other minerals were washed away by waves and storms through the deposition process. Either way, Pituffik appears to be an exceptional deposit in this way.
• Bulk sample: The first 250t batch of ilmenite has already been shipped down to a warehouse at a deep water port in Greenland for further shipment.
• The team are planning to produce around 500-600t this season but could produce much more if required given the very rapid production of the first 250t which has essentially been produced in the first full two weeks of the field season using simple screens.
• Purity: The amazing thing about Pituffik is the apparent purity of the ilmenite mineral sands and the near total lack of any other material, particularly clay which bungs up processing at many other mineral sands operations.
• In short, nature has done an amazing job in sorting out the heavy mineral sands from the lighter material and this can be very clearly seen from the air where rivers show plumes of natural sand being washed down the shoreline to other beaches leaving a mass of ilmenite sand on Bluejay’s licenses at Pituffik. We note, other beach sands in the region do not appear to have similar areas of ilmenite concentration.
• Microscopy indicates good purity levels with the ilmenite grains liberated by erosion. The very heavy levels of erosion seen in general in Greenland appear to have served to liberate the ilmenite in a way that may not be seen in less active environments.
• Sonic Drilling: we believe the sonic drill rig will show high-grade ilmenite in a mass of heavy mineral sands largely free of any other mineralisation till the base rock.
• Bucket test: We completed our proprietary SP Angel bucket test on the BlueJay license. The test involved borrowing a five liter bucket from the kitchen, filling it with mineral sands off random locations on the beach, weighing said bucket with some recently purchased luggage scales. Our test showed high levels of heavy mineral sands from all areas and particularly near the shore line where we weighed 13.4kg for approximately 5kg of mineral sands with no sieving.
• Beaches and Terraces: The very high level of erosion caused by glacial and freeze/thaw erosion combined with the unusually high level of ilmenite rich dyke swarms has created an exceptional environment for the sorting of heavy mineral sands over millions of years enabling the natural enrichment and deposition into the active beaches which have then been uplifted to form deep terraces of ilmenite mineral sands. Drilling is reported to show ilmenite to >30m of depth in this environment. This fits with a theoretical beach model when considering the scale of the beach terraces and surrounding geology in our view.
• Shipping: the Fjords of Greenland provide deep shipping lanes with depths of >800m seen by us on the sonar during our travels. Deep water is present very close to shore at Pituffik and it should be relatively inexpensive and simple to rig up a short 10-20m pier and conveyor for the loading of Handymax or Panamax ships through the summer months. Ice breaking could extend the shipping season though we suspect this will not be necessary if the carriers can load in time. The bathymetry survey should be completed in the next few weeks and should show the best location for the pier, though nature has provided much of the infrastructure to be needed.
• Moriusaq Bay: The Moriusaq Bay area provides a natural harbour to protect against passing icebergs and heavy weather. The bay, active beaches and raised beaches appear to contain significant concentrations of potentially uniform ilmenite.
• Iterlak Delta: The Iterlak Delta and raised beaches appears to host exceptionally high-grade ilmenite as seen in the very heavy and black nature of the mineral sands. The delta is solid to walk across due it its concentration of heavy mineral sands. People tend to sink into normal sand in such wet environments but the density of the heavy minerals in the sand at Iterlak makes it quite unlike any beach we have ever walked across.
• The ‘freeboard’ or wall of mineral sand demarking the raised beach from the lower delta area at Iterlak gives a view as to the probable depth of ilmenite in the raised beach, though we do not yet know the depth of ilmenite in the more active delta environment.
• Environmental: a local group, Orbicon Artic are working on a baseline sampling program for the EIA though we saw nothing to cause any particular concern on the beaches or at the shore line.
• Moriusaq camp: The abandoned settlement at Moriusaq provides a camp of reasonable quality saving BlueJay a small fortune in camp costs. The former supermarket provides a useful mess room and canteen and the recent installed washrooms are a significant addition for the team working at site.
• Kitchen: an army marches on its stomach and miners in the field are just the same. We are pleased to report that the Pituffik kitchens are well appointed with an unusually creative Danish chef and enough grub to keep the team going through this season and beyond, though the coffee could take some getting used to.
• Health & safety: Two minor injuries were sustained by staff eating Snow Crab and some icebergs were damaged while testing anti-polar bear deterrent devices. All other health and safety issues appear well managed.
• Feasibility study: the team now look set to deliver a feasibility study on the project in the second half which will likely show very low unit operating costs and strong economic potential for the project. Our own preliminary evaluation of the project economics shows significant value and considerable upside from here.
• Processing: The mineral sands at Pituffik appear to require very little in the way of mineral processing. Simple screening and sieving produces concentrate for testing while the use of spirals should produce a viable concentrate for sale. A further stage of processing using permanent 'neodymium' magnets may produce concentrate which is suitable for 'Chloride' producers commanding higher prices for this purer material. This fetches the higher end of market prices at around $180-220/t.
• Ilmenite market: we expect the environmental crackdown in China to further restrict the processing of titano-magnetite ores and concentrates. This should restrict the availability of titanium from this source and drive demand for ilmenite ‘titanium’ rich concentrates from mineral sands.
• Ilmenite pricing: The Metal Bulletin report bulk concentrate TiO2 prices for 54% FOB Australia today at $160-180/t though higher prices of around $180-280/t are seen in the market depending on quality.
• Valuation: we are upgrading our target price today to 24p/s from 22p/s based on adjustments to our cash flow analysis following our site visit.
• Conclusion: Pituffik is one of the most economically promising mineral projects we have ever had the privilege to visit.
*SP Angel act as nomad and broker to BlueJay Mining
BlueRock Diamonds* (LON:BRD) 1.75p, Mkt Cap £1.2m – £860,000 fund raising
• BlueRock Diamonds reports that it has raised £860,000 via the issue of 68.8m new shares at a price of 1.25p/share. The additional shares represent approximately 50% of the enlarged capital.
• The funds are to be used “to further develop mining operations at Kareevlei mine.”
• Expanding on the company’s plans for the funds raised, CEO, Adam Waugh, said “These funds will enable us to complete some minor modifications to our plant designed to increase production volumes further and provide the working capital to put us in a position to achieve our short term goal of 25,000 tonnes production per month. We will soon be mining the sub 20 metre level of Kimberlite where we expect to see an uplift in our grade of diamonds recovered and a move to profitable mining. This will put us in a good position to optimise our known resource at Kareevlei and explore new opportunities. We look forward to providing further updates in due course."
• The company has also confirmed that a six-month loan facility provided by Messrs. Tim Leslie and Mark Poole and by Segar Properties (Hyde Park) – a company wholly owned by Mr Paul Beck, for up to £150,000 originally due to mature on 15th September 2017 has been extended until 31st December 2017.
• Mr Leslie and Segar have each also provided an additional $£20,000 loan at a 10%pa coupon rate.
Conclusion: The additional funding comes at a time when mining is moving into deeper levels of the open-pit mine where grades are expected to improve.
*SP Angel acts as Nomad & Broker to BlueRock Diamonds
Endeavour Mining (CVE:EDV) C$22.78, Mkt Cap C$2,198m – Sale of Nzema mine – a possible yardstick for west African gold mine value
• Endeavour Mining reports that it has sold its 90% interest in the short-life, non-core Nzema gold mine situated near Takoradi in Ghana to BCM International, described as “one of Africa’s largest mining and civil contractors” for US$65m. The transaction comprises an initial payment of US$20m with the balance as a series of deferred payments over the remaining mine life until 2019.
• The Nzema operation, which produced 87,710oz of gold in 2016 at an all-in sustaining cost of $1167/oz contains a proven/probable reserve of 291,000 oz of gold within a measured/indicated resource of 1.43moz and a further inferred resource of 243koz.
• Based on published 2017 production guidance of 100-110,000 oz of gold, we estimate that Endeavour Mining is selling Nzema at a valuation of $248/oz of attributable ore reserves, $50/oz of measured and indicated resources and $823/oz of 2016 production ($657-722/oz of projected 2017 production). These figures give a current, albeit limited, snapshot of current gold mine valuation in west Africa.
Georgian Mining* (LON:GEO) 17.25p, Mkt Cap £19.8m – Strengthening the team
(Georgian’s assets in Georgia are held in a 50:50 joint venture)
STRONG BUY
• Georgian Mining reports that it has appointed an experienced process engineer and metallurgist, Mr Mikhail Leskov, as an advisor “to assist the Company in the development and commencement of gold and copper production at the Kvemo Bolnisi East Project”.
• Mr Leskov, who has over 35 years relevant experience, including as the founder and Chairman of NBL Gold, described as “one of the first and largest engineering consulting groups in post-Soviet Russia”, “will work closely with the Company’s JV partner, the owner of two adjacent producing gold and copper mines and processing facilities at Madneuli and Sakdrisi.”
• Mr Leskov, who graduated as a mineral processing engineer from the Moscow Institute of Steel and Alloys has previously run scoping studies and metallurgical programmes across a wide range of commodities as well as projects to re-engineer and optimise efficiencies to maximise production.
• He has also served as a “member of the Board of the Union of Gold Producers of Russia, a non-commercial organisation, founded in 1995 to assist in the development of the gold mining and precious metals industry in Russia.”
Conclusion: The appointment of an experienced technical engineer with long-standing and wide ranging experience in the post-Soviet era mining industry as an advisor should smooth the path to production from Kvemo Bolnisi and the company’s wider ambitions in Georgia.
*SP Angel acts as Nomad and Broker to Georgian Mining.
Kefi Minerals* (LON:KEFI) 5.5p, Mkt Cap £18.3m – Residual funding requirement reduced
• Kefi Minerals reports that, following the previously announced funding agreement with Oryx Management which left the residual funding requirement at US$32m it has now further reduced the remaining requirement to US$ 24m “based on refinements to planned capital expenditure and contingency provisions.”
• The company has identified potential sources for this last part of the funding matrix “from a separate finance facility against ore stockpiles which are estimated to include US$15 million of contained gold at start-up of production”.
• Kefi “intends to optimise the finance mix in consultation with the Project syndicate, in particular the Government of Etiopia and principal financier Oryx” however it provides the reassurance that “It remains Kefi’s preference to retain majority ownership and control of the Project.”
Conclusion: Kefi Minerals has sharpened its pencil on the capital estimates and contingency allowances for the Tulu Kapi project and found an $8m saving.
*SP Angel act as Nomad and broker to Kefi Minerals
Rainbow Rare Earths Ltd (LON:RBW) – 11.25p, mkt cap £17.4m – Higher grades identified for first 2 years of production
• Rainbow Rare Earths has announced that as a result of independent laboratory testing of material from the Gasagwe area of its Gakara rare-earths project in Burundi, it has identified grades as high as 62% total rare earths oxide (TREO) which “is expected to provide ore for the first two years of production, which is targeted to commence in Q4 2017.”
• The samples come from grade control samples over the upper 2 metres of a vein which is exposed over 80m along strike and which is expected to be mined first in the development.
• The grades are higher than the already exceptionally high 57% TREO grade “as disclosed in the Competent Person’s Report compiled by MSA contained in Rainbow’s IPO Prospectus published in January 2017.”
• The company also highlights that “Rainbow’s basket price has increased by 33% during 2017 following strengthening REE prices”.
Conclusion: Rainbow Rare Earths has located a higher grade area for initial production of what is already reported to be “one of the highest grade rare earth element mining projects globally.”
Savannah Resources (LON:SAV) 5.25p, Mkt Cap £29.4m – Drilling report from Mina do Barroso
• Savannah Resources reports that it has now completed 16 reverse-circulation drill holes at its 75% owned Mina do Barroso lithium exploration project in Portugal. At this stage assay results have yet to be received from the laboratory.
• The company has completed 7 holes (605m) at the Reservatorio area and a further 7 holes (565m) at Grandao, both of which remain open both down dip and along strike. The whereabouts of the remaining two holes is not clear, however the wider exploration area of over 1000 sq km no doubt provides ample opportunities.
• At Reservatorio, the drilling has intersected between 15-39m widths of pegmatite over a strike length of 400m and “on one section at least to 80m down dip”. Pegmatite was intersected in each of the 7 holes drilled and in all but one the drilling encountered multiple pegmatite horizons.
• Drilling at Grandao encountered multiple pegmatite horizons in each of the holes along 200m of strike and “has indicated that the body is close to flat or shallowly dipping to the south west. … The pegmatite body remains open in all directions …”.
• The drilling is continuing.
Conclusion: Initial drilling at Mina do Barroso has confirmed the presence of multiple pegmatite bodies though the extent and tenor of lithium mineralisation will need to be confirmed by the assays. The relatively shallow and flat lying structures at Grandao may, subject to grade, offer potential for relatively straightforward mining at some point in the future.