Proactive Investors - Run By Investors For Investors

Predictive Discovery drills 27 metres at 2.42 g/t gold at Nyangboue

Infill drilling was testing a 720-metre section of the 1.2-kilometre-long gold mineralised zone at Nyangboue.
Drill intersection from Nyangboue gold mineralised zone with mineralisation open at depth
Results from the first 15 holes of the completed 31-hole infill program were received

Predictive Discovery Ltd (ASX:PDI) has received assay results from its drilling program at the Nyangboue Prospect within the Boundiali Project in northern Cote D’Ivoire.

Results from the 31-hole reverse circulation (RC) infill program featured 27 metres at 2.42 g/t gold from 27 metres and 13 metres at 1.78 g/t gold.

Assays from the final 16 holes remain pending as well as the results from 4,577 metres of completed trenching elsewhere within the Boundiali Project.

READ: Predictive Discovery managing director buys share on-market

Predictive’s managing director Paul Roberts said: “The Boundiali Project contains multiple high priority targets over 20 kilometres of gold geochemical anomalies, which are being systematically tested with trenching and drilling programs.

“The Nyangboue infill drill results add significant upside to the wider Boundiali Project, which has strong potential to host economic gold mineralisation.

“PDI expects an acceleration of news flow in the coming months including trench and drill results from Boundiali North along with diamond drill assays from Ferkessedougou North in Cote D’Ivoire and new geochemical results and ground acquisitions from elsewhere in West Africa.”

10,000-metre drill program ongoing

The drilling completed at the Nyangboue Prospect is part of a 10,000-metre RC program at the Boundiali Project that commenced earlier this year.

Predictive (30%) has a joint venture agreement with Toro Gold Limited that covers both its Boundiali and Ferkessedougou North projects in Cote D’Ivoire.

Work is on ongoing across the Boundiali Project with results pending from 4,577 metres of trenching completed and follow-up RC drilling underway at the Boundiali North Permit.

The Boundiali Project consists of two permits – Boundiali North and Boundiali South - which cover 29 kilometres of strike length within a very well-mineralised greenstone belt.

 

 

View full PDI profile View Profile

Predictive Discovery Ltd Timeline

Related Articles

1553176178_Kwale---workers.jpg
March 22 2019
Base Resources is now debt free, with revenue on the rise and a new project advancing well
1553096936_W-Resources---Michael-Masterman.jpg
June 29 2019
W Resources is about to make a name for itself as a serious European-based supplier of tungsten
Unloading concentrate at Wyndham port shed
January 15 2019
Ramp-up to full underground production is on schedule and concentrate is being trucked to the Wyndham port.

© Proactive Investors 2019

Proactive Investors Australia PTY LTD ACN:132787654 ABN:19132787654.

Market Indices, Commodities and Regulatory News Headlines copyright © Morningstar. Data delayed 15 minutes unless otherwise indicated. Terms of use