Alt Resources Ltd (ASX:ARS) has completed phase II reverse circulation (RC) drilling at its Bottle Creek Gold Project along the Mt Ida gold belt in Western Australia.
The 45-hole RC program was designed to validate historical drilling, test mineralisation extensions south of the Emu deposit and infill existing drill fences between Emu and the Southwark deposit.
READ: Alt Resources drills significant gold zones at Southwark deposit
All drill samples have been delivered to the ALS laboratory in Kalgoorlie and initial results from the first 800 metres are expected in the coming weeks.
All analyses should be complete within the next 4-5 weeks.
ALS has reported a backlog of assay work due to the current high volume of drilling being undertaken in the West Australian goldfields.
READ: Alt Resources begins second-phase drilling at Bottle Creek Gold Project
Alt will soon commence metallurgical and flowsheet development to establish an operation capable of processing an initial 500,000 tonnes per annum of ore, with potential to expand.
The company has engaged METS Engineering to review all historical documentation from the Bottle Creek process plant and cost the metallurgical test work and flowsheet development.
Minecomp Kalgoorlie has been engaged to commence mine plan and pit optimisation for the pre-stripped Emu deposit and the Southwark deposit.
The company plans to release the maiden JORC resource for the project in August, with a second resource upgrade to follow once Alt receives the results of phase II RC drilling and completes resource modelling.