Proactive investorsLogo Proactive Investors UK Website

Search field
Get Adobe Flash Player Download
Flash
Player ►

And
Enable
Javascript

1 year chart

digital-look imported chart image

1 day chart

digital-look imported chart image
Additional information
Additional Information
Market: ASX
Sector: Oil and Gas Exploration and Production
Epic: ASX:PRE
News: Latest news
Web Site: Pacrim Energy
Other Articles: 21-05-200918-03-2009

RSS - Subscribe to the News Today on Proactive UK ▼

Thursday March 18, 09:06The drugs work: Biocompatibles sees further good sales growth ahead

After better-than-expected sales growth in the 2009 full year, the drug-eluting beads maker forecasts more growth this year while the Oncology Products Division revs up the pace of product trials.

FULL ARTICLE ►

RSS - Subscribe to the News Today on Proactive NA ▼

Friday March 19, 01:18Can Europe march towards economic prosperity with a common currency but without a common government?

An apparently disappointed Mr. Papandreou has stated that he may turn to the International Monetary Fund for an emergency loan should the EU fail to provide adequate financial support.

FULL ARTICLE ►

RSS - Subscribe to the News Today on Proactive CN ▼

Monday March 15, 08:01China's growth boosting commodity prices

The latest economic figures from China have put pressure on the dollar and boosted a number of high-yielding currencies, including the Australian dollar and the South African rand.

FULL ARTICLE ►
Pacrim Energy

Pacrim Energy

Pacrim Energy's primary focus is the Redcliffe Gold Project in Western Australia, though the company holds a number of additional gold exploration projects and also has oil and gas interests in the United States.
Monday, December 21, 2009

Pacrim Energy increases resource estimate by 54% at Golden Terrace South.

company news image

Pacrim Energy (ASX: PRE) has closed out 2009 with a major upgrade in the gold resource at Golden Terrace South within the Redcliffe Gold Project in the north eastern Goldfields of Western Australia.

The initial resource estimate of 44,000 ounces has been markedly increased by 54% to 68,000 ounces of gold.

Significant mineralised intercepts located to the south of the current resource are yet to be incorporated into the estimate as further data is required.

The recent interpretation of data, incorporating infill and extension drilling, has considerably raised tonneage estimates of mineralisation and as a consequence, will tend to decrease the likely waste to ore stripping ratio.

Following the positive outcome, Pacrim has engaged consulting mining engineering services to coordinate development of the Golden Terrace South mining operation, with the Company anticipating the commencement of gold production in the second half of 2010.

A programme of triple tube diamond drilling is to be undertaken to provide material for further detailed metallurgical test work, confirm interpretations, and provide geotechnical information for detailed pit design.

It is expected by Pacrim that detailed studies currently underway will result in upgrading of the classification of much of the resource to a status facilitating project financing alternatives.

This will assist in limiting the need for further shareholder dilution as the Company moves towards production in 2010.

Sterilisation AirCore drilling has been conducted across areas that were proposed for location of waste dumps and stockpiles. Plus 1g/t intercepts from single metre splits included 1m @ 3.93 g/t, 1m @ 2.94g/t, and 1m @ 1.32g/t require additional drilling to determine the extent of mineralisation.

The Redcliffe Project covers approximately 65 kilometres of strike length of the Mertondale Shear Zone along with
parallel and associated structures.

An estimated 400,000 ounces of gold has been produced from the Mertondale Shear Zone from historic mines and pits that operated in the 1980s and 1990s. These include the shallow Nambi and Redcliffe pits that produced in excess of 90,000 ounces from within the Pacrim project tenements.

The Company’s Redcliffe Gold Project exploration led to the initial resource estimate of 151,000 ounces of gold, consisting of an Indicated Resource of 385,000 tonnes @ 3.42g/t and an Inferred Resource of 1,678,000 tonnes @ 2.0g/t.

This has now been increased to 175,000 ounces (consisting of an Indicated Resource of 1,007,000 tonnes @ 2.72g/t and an Inferred Resource of 1,565,500 tonnes @ 1.73g/t).

AddThis Feed Button
Register here to be notified of Proactiveinvestors One2One Forums.


No investment advice

The Company is a publisher and is not registered with or authorised by the Financial Services Authority (FSA). You understand and agree that no content published on the Site constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is suitable or advisable for any specific person. You further understand that none of the information providers or their affiliates will advise you personally concerning the nature, potential, advisability, value or suitability of any particular security, portfolio of securities, transaction, investment strategy, or other matter.

You understand that the Site may contain opinions from time to time with regard to securities mentioned in other products, including company related products, and that those opinions may be different from those obtained by using another product related to the Company. You understand and agree that contributors may write about securities in which they or their firms have a position, and that they may trade such securities for their own account. In cases where the position is held at the time of publication and such position is known to the Company, appropriate disclosure is made. However, you understand and agree that at the time of any transaction that you make, one or more contributors may have a position in the securities written about. You understand that price and other data is supplied by sources believed to be reliable, that the calculations herein are made using such data, and that neither such data nor such calculations are guaranteed by these sources, the Company, the information providers or any other person or entity, and may not be complete or accurate.

From time to time, reference may be made in our marketing materials to prior articles and opinions we have published. These references may be selective, may reference only a portion of an article or recommendation, and are likely not to be current. As markets change continuously, previously published information and data may not be current and should not be relied upon.