Sign up Australia
Proactive Investors - Run By Investors For Investors

Prospero Silver uncovers new gold and silver vein system at Pachuca Southeast project, Mexico

Third of three projects drilled with Fortuna Silver yields some very interesting results
Prospero Silver uncovers new gold and silver vein system at Pachuca Southeast project, Mexico
Prospero's project generation strategy focuses on precious metals

Prospero Silver Corp (CVE:PSL) has uncovered a new gold-and-silver-bearing vein system at the Pachuca Southeast project in Mexico.

Pachuca Southeast is the third of three early-stage "proof of concept" projects financed by Fortuna Silver Mines and involved the drilling of three holes with a combined depth of 1,800m. 

"Although the current drill program is limited to 3 holes, we've cut new vein systems within 25km of one of the world's great silver-gold districts, the Pachuca-Real Del Monte system, which produced over 1.2-billion ounces of silver," said Tawn Albinson, the president of Prospero.

Highlight intercepts..

Among the highlight intercepts was  0.5 m (meters) of 1.04 ppm (parts per million) gold (Au) and 193 ppm silver (Ag) in one hole - PSE-18-02.

In another hole -PSE-18-01 - an 0.8m zone returned 16.9 ppm silver, and from 210.75m a 1.05 m interval returned 23.8 ppm silver.

Albinson added: "We have at least six to seven km of linear, structurally controlled alteration at surface on our concession, so hitting multi-ounce and multigram silver and gold grades with the first two holes is exciting.

"The intercepts, which include 1.35 metre at 227 Ag between 147.4 m and 148.8 m in hole 1, demonstrate that the negligible Ag and Au anomalies we noted in the surface alteration are related to a potentially significant epithermal vein system at depth.

"For example, the main vein structure in hole 2 is over 12 m thick down hole; probably eight m to 10 m true thickness, carries 0.39 parts per million Au and 33 ppm Ag, and the third intercept, which is 0.75 m in width, carries 6.4 ppm Au and 75 ppm Ag."

Good infrastructure..

The 7,256 hectare Pachuca SE concession lies 24 km southeast of the city of Pachuca, Hidalgo.

Major power lines and the Pachuca-Tulancingo freeway cross the middle of the property, while it is on strike from the Pachuca-Real del Monte epithermal vein camp, one of the world's largest epithermal precious metal deposits.

Shares were unchanged at C$0.14 each.

View full PSL profile View Profile

Prospero Silver Corp Timeline

Related Articles

1519733436_Guanajuato-silver-pour.jpg
February 28 2018
Great Panther's solid operating cashflow set to provide platform for significant growth
shutterstock_176799659_5950db32c746a.jpg
June 26 2017
Prospero Silver has set the drill rigs turning on its Mexican silver projects

No investment advice

The information on this Site is of a general nature only. It does not take your specific needs or circumstances into consideration, so you should look at your own financial position, objectives and requirements and seek financial advice before making any financial decisions. You acknowledge and understand that neither the Company, its related bodies corporate, the information providers or their affiliates will advise you personally about the nature, potential value or suitability of any particular security, portfolio of securities, transaction, investment strategy, or other matter. You should read our FSG and any other relevant disclosure documents and if necessary seek persona advice prior to making any investment decision.

You understand and agree that no Content (as defined below) published on the Site constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is suitable or advisable for any specific person.

You understand that in certain circumstances the Company, its related bodies corporate, the information providers or their affiliates may have received, or be entitled to receive, financial or other consideration in connection with promoting, and providing information about, certain entities on the Site and in communications otherwise provided to you.

You understand that price and other data is supplied by sources believed to be reliable, that the calculations herein are made using such data, and that neither such data nor such calculations are guaranteed by these sources, the Company, the information providers or any other person or entity, and may not be complete or accurate. From time to time, reference may be made in our marketing materials to prior articles and opinions we have published. These references may be selective, may reference only a portion of an article or recommendation, and are likely not to be current. As markets change continuously, previously published information and data may not be current and should not be relied upon.

Before you act on any general advice we provide, please consider whether it is appropriate for your personal circumstances.

© Proactive Investors 2018

Proactive Investors Australia PTY LTD ACN:132787654 ABN:19132787654.

Market Indices, Commodities and Regulatory News Headlines copyright © Morningstar. Data delayed 15 minutes unless otherwise indicated. Terms of use