Sign up Australia
Proactive Investors - Run By Investors For Investors

Sayona Mining commences exploration at Pilbara lithium project

Initial mapping and sampling programs have commenced.
Sayona Mining commences exploration at Pilbara lithium project
Sayona has commenced first phase exploration at the Mallina.

Sayona Mining (ASX:SYA) has commenced first phase exploration at the Mallina project which is located in the world world-class Pilgangoora lithium district of Western Australia.

Initial mapping and sampling programs have commenced including rock chip sampling and mapping, targeting extensions of the known mineralisation.

Other prospective areas in the tenement package that have been identified through satellite and air photography imagery will also be explored.

Other work will include soil geochemistry to target pegmatites hidden by shallow soil cover, widely present within the tenement.

Recent due diligence exploration conducted at Mallina has located significant zones of visible spodumene mineralisation grading up to 2.13% lithium oxide within a pegmatite mapped over 500 metres.


Mallina project

During December, Sayona secured an option to acquire an 871 square kilometre package of tenements in the world-class Pilgangoora district of Western Australia.

The package includes the Mallina project with newly identified spodumene pegmatite.

Highlights include rock chip samples up to 2.13% lithium in discovery pegmatite, with the average of the 10 rock chip samples collected to date being 1.28% lithium.

Mallina is located 80 kilometres west of the Pilgangoora lithium deposits of Altura Mining (ASX:AJM) and Pilbara Minerals (ASX:PLS), and compliments the company’s other 1,000 square kilometre lithium exploration portfolio in the Pilbara region.


Phase II drill program at Authier

Sayona lodged drilling permits in December for the Phase II resource expansion drilling program at the flagship Authier lithium project located in Quebec, Canada.

The company sees good potential to both expand the size of the existing resource and to optimise and improve the existing resource.

A diamond drilling program of up to 4,000 metres is planned to commence in early 2017.

This follows the recent 68% expansion of Authier’s contained lithium resource to 13.74 million tonnes grading 1.07% lithium oxide for 147,600 tonnes of contained lithium.

Importantly, the next phase of drilling will aim to define the size and grade of the recently discovered high-grade northern pegmatite and explore for additional pegmatites.

View full SYA profile

Sayona Mining Timeline

Related Articles

Danakali-Paul-Donaldson-MD-presenting-Melb-Feb-2017.jpg
February 24 2017
Paul Donaldson discussed with investors the Tier 1 Colluli Potash Project.
Uranium-periodic-table.jpg
February 03 2017
Anglo Pacific's move into Canadian uranium is a major statement of intent
Pictured is the Manica mine in Mozambique - today's news concerned a resource upgrade from there...
May 11 2016
The new estimate saw the total resource at Manica raised by 36% to 1.257mln ounces compared to a previous estimate

© Proactive Investors 2017

Proactive Investors Australia PTY LTD ACN:132787654 ABN:19132787654.

Market Indices, Commodities and Regulatory News Headlines copyright © Morningstar. Data delayed 15 minutes unless otherwise indicated. Terms of use