Sign up Australia
Proactive Investors - Run By Investors For Investors

Phosphate Australia intersects 28m at 6.7g/t gold in maiden drilling at Tukanarra

Phosphate Australia intersects 28m at 6.7g/t gold in maiden drilling at Tukanarra

Phosphate Australia (ASX: POZ) has intersected high grade gold in phase 1 drilling of the Cable West vein at the Tuckanarra gold project located in the prolific Western Australian Murchison goldfield.

Strong intersections include 28 metres at 6.7 grams per tonne (g/t) gold from 25 metres from the Cable West vein – a high grade structure and now the highest priority target.

Importantly, directly above this drill intersection was a 9 metre cavity which was mined out by underground miners in the 1900s. The reported historic mined grade at Cable was 22g/t from this period.

Recent results, including 20 metres at 2.1g/t from 70 metres, at the Cable East vein indicate a continuous, well mineralised structure up to 13 metres true width with a current strike length of about 350 metres which is open to the south and at depth.

The Tuckanarra gold project has a historic production of 125,000 ounces and was last mined in 1993 when the gold price was around US$330 an ounce.

The maiden phase 1 reverse circulation comprised 16 holes for 1,635 metres targeting shallow, steeply dipping, mineralised structures around the old Cable pit.

There is also a substantial area of shallow, sub horizontal, laterite hosted mineralisation that covers most of the lode gold target area.

This laterite mineralisation was the target of a phase 2 aircore drilling campaign, comprising 213 holes for 5,062 metres, completed early in February. Assays from this program are due in March.

Phosphate Australia is now planning a phase 3 drilling program for April.



Register here to be notified of future POZ Company articles
View full POZ profile

Phosphate Australia Timeline

Related Articles

African Potash making progress with second deal in less than a month
August 02 2016
The longer-term plan is to create a vertically integrated operator that has the mining, processing and marketing skills to tap into a region that buys in an estimated 10mln tonnes of fertiliser a year.
Fertliser spreader on arable land
June 28 2016
The firm has hired CH2M Engineers Inc (CH2M), Norwest Corporation (Norwest), and Novopro Projects (Novopro) to complete the NI43-1O1 report and technical study.
jigsaw.jpg
October 26 2016
The pact with a subsidiary Gina Rinehart’s Hancock Prospecting will form an important plank of the overall funding package for the AIM-listed group’s North Yorkshire Polyhalite Project.

© Proactive Investors 2017

Proactive Investors Australia PTY LTD ACN:132787654 ABN:19132787654.